ScorpionStoves
Ring Gareth07907 086764

A knockout, day by day

Sheets down on day one. Fire lit at the end.

A full fireplace knockout takes two to three days. Gareth tells you how long your job will take on the survey.

Day one The mucky bit

  1. Dust sheets everywhere. Furniture moved, the room sealed off.
  2. The old fireplace is knocked out and the opening checked.
  3. Cement boarded, and plastered where it’s needed.

Day two or three The good bit

  1. The slate hearth goes down and the stove is set in place.
  2. Everything connected and checked, ready to be signed off with building regs.

First burn done with you. Gareth lights it, shows you the air controls, and leaves you with a warm room and no mess.

Gareth crouched by the hearth lighting a match